PM_40_60  Project information management information

General information

Category

PM_40  Design and approvals information

Status

This code is part of the latest version of Uniclass. Project management v1.26, October 2024

Contains

PM_40_60_01  4D programme federated model

PM_40_60_02  5D cost federated model

PM_40_60_03  6D handover sequence federated model

PM_40_60_05  Activities terminology

PM_40_60_06  Asset delivery description

PM_40_60_07  Benefits realization plan

PM_40_60_08  BIM execution plan

PM_40_60_09  BIM maturity assessment report Not in use

PM_40_60_11  Capability and capacity assessment information

PM_40_60_12  Clash detection resolution report

PM_40_60_14  Change control plan

PM_40_60_15  Change control records

PM_40_60_16  COBie data set

PM_40_60_18  Communications plan

PM_40_60_19  Construction risk review

PM_40_60_20  Contingency plan

PM_40_60_21  Curriculum vitae (CV)

PM_40_60_22  Data security policy

PM_40_60_23  Description terminology

PM_40_60_24  Detailed responsibility matrix

PM_40_60_25  Design process management plan

PM_40_60_26  Design programme

PM_40_60_27  Electronic data interchange (EDI)

PM_40_60_28  Document numbering system

PM_40_60_29  Document control information

PM_40_60_31  Federated coordination models

PM_40_60_33  Federated information models

PM_40_60_34  Fire safety information exchange (FIREie)

PM_40_60_35  Fire safety management plan

PM_40_60_38  Information assurance

PM_40_60_39  Information validation

PM_40_60_40  Information verification

PM_40_60_41  Information delivery plan

PM_40_60_42  Information mobilization plan Not in use

PM_40_60_43  Installation process management plan

PM_40_60_44  Information security triage matrix

PM_40_60_45  Key performance indicator (KPI) information

PM_40_60_47  Landowner notice

PM_40_60_50  Master information delivery plan

PM_40_60_53  Mobilization plan

PM_40_60_53  Model production and delivery table Not in use

PM_40_60_62  Post-occupancy evaluation

PM_40_60_63  Project breakdown structure documentation

PM_40_60_64  Pre-appointment BIM execution plan

PM_40_60_65  Post-contract BIM execution plan Not in use

PM_40_60_65  Project execution plan

PM_40_60_66  Project information production methods and procedures

PM_40_60_67  Project information protocol

PM_40_60_68  Project information standards

PM_40_60_70  Risk schedule

PM_40_60_72  Risk and opportunities management plan

PM_40_60_85  Stakeholder management plan

PM_40_60_87  Task information delivery plan

PM_40_60_89  Through-life management plan (TLMP)

Other items in this category

PM_40_20  Design strategies

Contains 37 current codes

PM_40_20  Performance requirements Not in use

Contains 24 codes that are not in use

PM_40_25  Design calculations

Contains 15 current codes

PM_40_30  Design information

Contains 29 current codes

Contains 8 codes that are not in use

PM_40_35  Design models

Contains 14 current codes

PM_40_40  Design drawings

Contains 16 current codes

PM_40_45  Specifications

Contains 21 current codes

PM_40_50  Approvals information

Contains 24 current codes

Publication history

Replaces

PM_40_60_53  Model production and delivery table Not in use

Where to use PM_40_60

COBie

  • PM_40_60 : Project information management information

Find out more about how mappings are determined.

Quick support links

General help

For help on how the Uniclass site works, browse our support

Consultation

Share your feedback on Uniclass improvements to ensure it works for you

Site feedback

Let us know how this site can work better for you

Technical support

Raise a support ticket if you're stuck

Still need help?

Click here to view further contact options including live chat, email and call