PM_70_75_05  Air quality test certificate

General information

Category

PM_70_75  Testing information

Status

This code is part of the latest version of Uniclass. Project management v1.26, October 2024

Contains

No more codes below this point

Other items in this category

PM_70_75_01  Acoustic test report

PM_70_75_02  Air distribution test report

PM_70_75_03  Access equipment test report

PM_70_75_04  Air leakage test certificate

PM_70_75_06  Bathroom pod test certificate

PM_70_75_07  Bell system test report

PM_70_75_08  Boiler test report

PM_70_75_09  Ceiling system fire resistance test report

PM_70_75_10  Chlorination test report

PM_70_75_11  Cable test report

PM_70_75_12  Cladding and curtain walling water test report

PM_70_75_13  Coliform and bacteria count test report

PM_70_75_14  Combined heat and power (CHP) system test report

PM_70_75_15  Control system test report

PM_70_75_17  Co-ordinated shut down interface test report

PM_70_75_21  Disabled alarms and disabled refuge alarm test report

PM_70_75_22  Drainage leakage test results

PM_70_75_23  Ductwork cleaning test certificate

PM_70_75_24  Ductwork cleaning test report

PM_70_75_25  Ductwork pressure test certificate

PM_70_75_27  Electrical installation test report

PM_70_75_28  Emergency lighting test report

PM_70_75_29  Energy meter calibration test report

PM_70_75_30  Fire protection installation test report

PM_70_75_31  Fire alarm test certificate

PM_70_75_32  Fire alarm decibel level test report

PM_70_75_32  Gas installation safety certificate Not in use

PM_70_75_33  Fume cupboard test report

PM_70_75_34  Gas interlock test report

PM_70_75_35  Generator test report

PM_70_75_36  Heating installation test report

PM_70_75_37  High-voltage electrical installation test report

PM_70_75_40  Information and communications technology (ICT) infrastructure test report

PM_70_75_45  Kitchen equipment installation test report

PM_70_75_47  Lifts test report

PM_70_75_48  Lighting lux level test report

PM_70_75_49  Lightning protection installation test report

PM_70_75_52  Monitoring systems connection test report

PM_70_75_61  Perimeter gates test report

PM_70_75_63  Pipeline pressure test certificate

PM_70_75_65  Pressure system installation test report

PM_70_75_68  Public health installation test report

PM_70_75_69  Rainwater drainage system test certificate

PM_70_75_70  Rainwater harvesting system test certificate

PM_70_75_71  Refrigerant pipeline pressure test certificate

PM_70_75_79  Sliding partitions test report

PM_70_75_81  Solar panel wind uplift test report

PM_70_75_83  Sound and lighting systems test report

PM_70_75_85  Surveillance equipment installation test report

PM_70_75_88  Telecommunications installation test report

PM_70_75_93  Voice alarm equipment test certificate

PM_70_75_94  Ventilation test report

PM_70_75_95  Wastewater drainage system test certificate

PM_70_75_96  Water distribution pressure test report

PM_70_75_97  Window cleaning equipment test report

PM_70_75_98  Workshop equipment test certificate

Where to use PM_70_75_05

COBie

  • PM_70_75_05 : Air quality test certificate

Find out more about how mappings are determined.

Quick support links

General help

For help on how the Uniclass site works, browse our support

Consultation

Share your feedback on Uniclass improvements to ensure it works for you

Site feedback

Let us know how this site can work better for you

Technical support

Raise a support ticket if you're stuck

Still need help?

Click here to view further contact options including live chat, email and call